Semiconductor & Embedded Engineering
What the programme demands
Fab programmes hire in waves, and the waves want different things. Construction and tool install need a large, time boxed cohort in place before the schedule allows for it, sourced fast and stood down when the phase closes. The same programme needs a much smaller permanent process and equipment team that will still be there in three years, hired against a production organisation chart rather than a ramp date. Running both through one pipeline at one pace fails in both directions: the ramp cohort arrives after the tools do, and the permanent roles get filled with whoever happened to be available. TSD separates the two and sources each on its own timeline.
How TSD staffs it
- —Time boxed install and hook up cohorts sized to the tool set and the ramp date
- —Permanent process, equipment and yield engineers hired to the production organisation chart
- —Contract to hire where the fab wants to see the work before committing to a headcount
- —Shift pattern coverage for tool operations that run around the clock
- —Cleanroom protocol and gowning discipline confirmed before mobilisation, not after arrival
- —Replacement cover held against the critical path roles rather than the whole cohort